GTT receives an order for the tank design of two new LNG Carriers
Published by Laura Dean,
Deputy Editor
Hydrocarbon Engineering,
GTT has received an order from a Korean shipyard concerning the tank design of two new 174 000 m3 LNG carriers, on behalf of a European ship-owner. The delivery of the ships is planned for the first semester of 2021.
GTT's membrane containment system Mark III Flex has been selected for the design of the tanks.
The ship-owner's and shipyard's names are confidential.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/10122018/gtt-receives-an-order-for-the-tank-design-of-two-new-lng-carriers/
You might also like
The Hydrocarbon Engineering Podcast - Protecting against LNG pool fires
In this episode of the Hydrocarbon Engineering Podcast, Alec Cusick, Owens Corning Technical Lead, Technical Insulation, joins us to talk about the risks of LNG pool fires and methodologies to mitigate these risks.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.
