GTT receives an order for the tank design of two new LNG Carriers
Published by Laura Dean,
Deputy Editor
Hydrocarbon Engineering,
GTT has received an order from a Korean shipyard concerning the tank design of two new 174 000 m3 LNG carriers, on behalf of a European ship-owner. The delivery of the ships is planned for the first semester of 2021.
GTT's membrane containment system Mark III Flex has been selected for the design of the tanks.
The ship-owner's and shipyard's names are confidential.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/10122018/gtt-receives-an-order-for-the-tank-design-of-two-new-lng-carriers/
You might also like
The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process
In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.