Skip to main content

GTT receives an order for the tank design of two new LNG Carriers 

Published by , Deputy Editor
Hydrocarbon Engineering,


GTT has received an order from a Korean shipyard concerning the tank design of two new 174 000 m3 LNG carriers, on behalf of a European ship-owner. The delivery of the ships is planned for the first semester of 2021.

GTT's membrane containment system Mark III Flex has been selected for the design of the tanks. 

The ship-owner's and shipyard's names are confidential.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/10122018/gtt-receives-an-order-for-the-tank-design-of-two-new-lng-carriers/

You might also like

Hydrocarbon Engineering Spotlight with Watlow

Chelsea Hogard, Engineering Team Leader for Watlow’s Industry 4.0 Development Team, joins us to discuss the importance of Data Insights in mitigating the risks associated with process heating.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news