Gas processing news
DOE authorises additional exports from Elba Island Terminal
The US Department of Energy has authorised an immediate 22% increase in exports of LNG from the Elba Island Terminal in the US.
Hormuz closure and related production outages are key drivers in EIA’s latest forecast
The US Energy Information Administration published its April Short-Term Energy Outlook this week, examining the implications of the closure of the Strait of Hormuz.
Integrated Dewaxing and Deoiling Systems - A Modern Integrated Approach for Advanced Wax and Base Oil Production
Integrated solvent dewaxing and deoiling systems gradually replace conventional wax separation units in refineries. The combination of solvent dewaxing and solvent or solvent-free deoiling improves operational efficiency and final products qualities. It reduces investment and operating costs. Refineries are unlocking additional value while meeting increasingly stringent market and regulatory requirements.
The heat pump: a modern and efficient solution
Atlas Copco Gas and Process industrial heat pumps help to upcycle low-temperature waste heat sources (such as river water and sewage water). With the use of a fraction of the electric power to drive the heat pump (typically 20 - 40%), and with no CO2 emitted, this upgraded waste heat can be re-used in a process with the lowest environmental impact possible.
LNG Canada to commence new construction work at marine terminal
LNG Canada is starting construction work near its marine terminal consisting of wharf demolition, quay wall construction, and assessment of dredging work.
ABB extends automation and electrical scope for Rio Grande LNG Trains 4 and 5
ABB has been awarded additional orders by Bechtel, extending its scope to deliver integrated automation and electrical solutions for Trains 4 and 5 of the Rio Grande LNG facility in the US.
ST LNG selects Baker Hughes as technology provider
Baker Hughes has been chosen to supply critical gas compression, power generation equipment, and project development support for ST LNG’s proposed 8.4 million tpy LNG export terminal offshore the US.
Maintaining Performance Under Pressure During Delayed Turnarounds
Refineries are delaying turnarounds and operating at higher capacity, increasing the risk of fouling, corrosion, and unplanned downtime. This article outlines practical strategies to improve efficiency, protect asset integrity, and maintain fired heater performance between turnarounds to sustain throughput and reduce operating costs.
ELTON Logistics and Services selects Reganosa to supervise LNG terminal construction
Reganosa has secured a new contract in Senegal as project management consultant for the LNG import terminal in Dakar promoted by ELTON Logistics and Services.
Venture Global and Vitol announce new LNG purchase agreement
Venture Global, Inc. and Vitol have announced the execution of an agreement for the purchase of approximately 1.5 million tpy of US LNG from Venture Global for five years commencing in 2026.