Skip to main content

JGC Corp. to build refinery in Basra region of Iraq

Published by , Editor
Hydrocarbon Engineering,


As reported by Reuters, Iraq’s government has signed a contract with JGC Corp. to build a 55 000 bpd refinery in the southern region of Basra.

The refinery will produce fuels including LPG, gasoline and gasoil.

The cost of the facility is estimated to be US$4 billion.

Read the article online at: https://www.hydrocarbonengineering.com/refining/30072020/jgc-corp-to-build-refinery-in-basra-region-of-iraq/

You might also like

Emerson to build new manufacturing hub in Saudi Arabia

The facility will provide customers with services for control systems engineering, staging and testing, manufacturing of differential pressure transmitters and control valves, and pressure relief and solenoid valve assembly.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news Oil refinery news Downstream contract news


 

Hydrocarbon Engineering is not responsible for the content of external internet sites.