Skip to main content

JGC Corp. to build refinery in Basra region of Iraq

Published by , Editor
Hydrocarbon Engineering,


As reported by Reuters, Iraq’s government has signed a contract with JGC Corp. to build a 55 000 bpd refinery in the southern region of Basra.

The refinery will produce fuels including LPG, gasoline and gasoil.

The cost of the facility is estimated to be US$4 billion.

Read the article online at: https://www.hydrocarbonengineering.com/refining/30072020/jgc-corp-to-build-refinery-in-basra-region-of-iraq/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news Oil refinery news Downstream contract news


 

Hydrocarbon Engineering is not responsible for the content of external internet sites.