Skip to main content

JGC Corp. to build refinery in Basra region of Iraq

Published by , Editor
Hydrocarbon Engineering,


As reported by Reuters, Iraq’s government has signed a contract with JGC Corp. to build a 55 000 bpd refinery in the southern region of Basra.

The refinery will produce fuels including LPG, gasoline and gasoil.

The cost of the facility is estimated to be US$4 billion.

Read the article online at: https://www.hydrocarbonengineering.com/refining/30072020/jgc-corp-to-build-refinery-in-basra-region-of-iraq/

You might also like

The Hydrocarbon Engineering Podcast - Overcoming downstream challenges with new technology

In this episode of the Hydrocarbon Engineering Podcast, Omar Sayeed, Centre of Excellence Leader for Reliability, and Rahul Negi, Director of AI and Industrial Autonomous, Honeywell Process Solutions, consider how new, innovative technology can help to overcome some of the challenges facing the downstream oil and gas sector.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news Oil refinery news Downstream contract news


 

Hydrocarbon Engineering is not responsible for the content of external internet sites.