Neste refinery in Porvoo is preparing for a major turnaround in spring 2024
Published by Poppy Clements,
Assistant Editor
Hydrocarbon Engineering,
During the scheduled time, the entire Porvoo refinery will be shut down for regulatory inspections, maintenance works and selected asset improvement initiatives. The estimated duration of the turnaround is approximately nine weeks.
“The major turnaround is an investment in securing safety, availability and competitiveness of the refinery. In addition, the turnaround will contribute to Neste’s ambition to make the Porvoo refinery the most sustainable refinery in Europe by 2030 and to reach carbon neutral production by 2035. Together with our audited contractors, we are committed to creating a safe working environment at the Porvoo refinery and a successful turnaround,” said Sami Wasström, Head of Turnarounds at Oil Products, Neste.
All contractors participating in the turnaround are required to commit to Neste Supplier Code of Conduct covering the areas of human and labour rights, occupational health and safety, climate, environment and ethical business conduct.
Neste harbour and distribution terminal at the refinery in Porvoo will operate normally during the major turnaround, and product deliveries to customers will continue without disruptions.
Read the article online at: https://www.hydrocarbonengineering.com/refining/14122023/neste-refinery-in-porvoo-is-preparing-for-a-major-turnaround-in-spring-2024/
You might also like
The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process
In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.