Neste refinery in Porvoo is preparing for a major turnaround in spring 2024
Published by Poppy Clements,
Assistant Editor
Hydrocarbon Engineering,
During the scheduled time, the entire Porvoo refinery will be shut down for regulatory inspections, maintenance works and selected asset improvement initiatives. The estimated duration of the turnaround is approximately nine weeks.
“The major turnaround is an investment in securing safety, availability and competitiveness of the refinery. In addition, the turnaround will contribute to Neste’s ambition to make the Porvoo refinery the most sustainable refinery in Europe by 2030 and to reach carbon neutral production by 2035. Together with our audited contractors, we are committed to creating a safe working environment at the Porvoo refinery and a successful turnaround,” said Sami Wasström, Head of Turnarounds at Oil Products, Neste.
All contractors participating in the turnaround are required to commit to Neste Supplier Code of Conduct covering the areas of human and labour rights, occupational health and safety, climate, environment and ethical business conduct.
Neste harbour and distribution terminal at the refinery in Porvoo will operate normally during the major turnaround, and product deliveries to customers will continue without disruptions.
Read the article online at: https://www.hydrocarbonengineering.com/refining/14122023/neste-refinery-in-porvoo-is-preparing-for-a-major-turnaround-in-spring-2024/
You might also like
Hydrocarbon Engineering Podcast
Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.
Watlow expands facility in Malaysia
Watlow accelerates growth in Malaysia with expanded facility and long-term commitment to southeast Asia’s industrial development.