Skip to main content

Frames delivers largest ever electrostatic coalescer for Tengizchevroil future growth project

Published by , Editorial Assistant
Hydrocarbon Engineering,


Oil and gas process equipment supplier, Frames, has successfully completed delivery of an electrostatic coalescer for Tengizchevroil LLP (TCO) in Kazakhstan.

As an integral part of the TCO future growth project (FGP), the electrostatic coalescer will remove water and contaminants from crude oil through desalting and dehydration. It is one of the largest ever delivered by Frames, weighing over 200 t.

The Frames electrostatic coalescer uses alternating current (AC) technology. It features proprietary inlet distributor technology for uniform distribution of the oil-water mixture.

For the TCO project, the electrostatic coalescer features a complex internal design to meet requirements, requiring superalloys and incoloy with weld overlays.

Following transportation to South Korea for module integration, the electrostatic coalescer will be shipped to Kazakhstan for final installation in Tengiz.

TCO is a joint venture between Chevron, ExxonMobil, KazMunayGas and LukArco.

Read the article online at: https://www.hydrocarbonengineering.com/refining/13092018/frames-delivers-largest-ever-electrostatic-coalescer-for-tengizchevroil-future-growth-project/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):