Sipchem schedules periodic maintenance turnaround for diol plant
Published by Alex Hithersay,
Editorial Assistant
Hydrocarbon Engineering,
Saudi International Petrochemical Co. (Sipchem) has announced the scheduled periodic turnaround maintenance of International Diol Co. (IDC), an affiliate of Sipchem, aimed at enhancing reliability and efficiency of production.
This scheduled turnaround maintenance of the IDC plant began on 15 January 2019 and is planned to be completed within 41 days.
The financial impact of this scheduled turnaround maintenance will be announced once the activity is completed and will also be reflected in 1Q19 financial results.
Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/16012019/sipchem-schedules-periodic-maintenance-turnaround-for-diol-plant/
You might also like
The Hydrocarbon Engineering Podcast - Evaluating the challenges and opportunities of CCUS
In this episode of the Hydrocarbon Engineering Podcast, Andrea Bombardi, Executive Vice President, RINA, offers technical and operational insight into some of the key challenges and opportunities of CCUS implementation.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.
