Sipchem schedules periodic maintenance turnaround for diol plant
Published by Alex Hithersay,
Editorial Assistant
Hydrocarbon Engineering,
Saudi International Petrochemical Co. (Sipchem) has announced the scheduled periodic turnaround maintenance of International Diol Co. (IDC), an affiliate of Sipchem, aimed at enhancing reliability and efficiency of production.
This scheduled turnaround maintenance of the IDC plant began on 15 January 2019 and is planned to be completed within 41 days.
The financial impact of this scheduled turnaround maintenance will be announced once the activity is completed and will also be reflected in 1Q19 financial results.
Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/16012019/sipchem-schedules-periodic-maintenance-turnaround-for-diol-plant/
You might also like
Hydrocarbon Engineering Podcast
In this episode, Alan Gelder, Senior Vice President of Refining, Chemicals and Oil Markets at Wood Mackenzie, provides a review of downstream markets in 2024 and looks ahead to what 2025 may hold for the sector.
Commercial progress for the Barents Blue project
Horisont Energi has progressed the commercial work and has passed a milestone for the Barents Blue project.