Skip to main content

Gas processing

 

New station to include LNG pumps

Total Nederland and PitPoint.LNG have started construction of a new multiple-energy truck station.

 
 
 
 

Expanded Black River Processing Plant begins start-up

The expansion of the Black River Processing Plant adds an incremental designed inlet capacity of 200 million ft3 of natural gas per day to the previously existing designed inlet capacity of 260 million ft3 of natural gas per day.

 
 
 
 
 
 

Bracing for a second wave

Wood Mackenzie reports that the oil and gas markets are bracing for the impact of a second wave of the COVID-19 pandemic.

 
 

API updates key LPG safety standard

The API has published the ninth edition of API Standard 2510, covering the design, construction, and location of LPG storage installations and handling facilities.

 

EIA: US LNG exports low

The EIA reports that exports of US LNG remain at low levels this summer.