Skip to main content

H-Energy signs LNG MOU with Petrobangla

Published by , Editorial Assistant
Hydrocarbon Engineering,


Achieving a major milestone for supply of re-gasified LNG from India to Bangladesh, H-Energy signed the memorandum of understanding (MOU) with Petrobangla on 16th June 2021. The companies will soon finalise a long-term supply agreement to commence the supply of re-gasified LNG to Bangladesh through a cross border natural gas pipeline.

H-Energy was authorised by Petroleum and Natural gas Regulatory Board (PNGRB), the regulatory body in India, to build, own and operate the Kanai Chhata-Shrirampur natural gas pipeline connecting H-Energy’s LNG terminal in West Bengal passing through various regions of the state and further connecting to the Bangladesh border, to enable cross border supply of re-gasified LNG into Bangladesh.

H-Energy is the only company to have received the authorisation from PNGRB to lay a pipeline till Bangladesh border. Mr Darshan Hiranandani, CEO of H-Energy, said: “this is a key milestone in the future of Indo Bangladesh energy cooperation. I am grateful to the Government of Bangladesh, the team at Petrobangla and the various governmental agencies of India whose unstinted support has made this happen. Our objective is to deliver environmentally friendly, safe, and economical energy to the state of West Bengal and to Western Bangladesh. Thanks to the efforts of all stakeholders, most permissions are in place and we shall see important milestone after milestone in this project happen at a rapid pace.”

H-Energy’s wholly owned subsidiary, HE Marketing pte, will be responsible for sourcing LNG and for supplying R-LNG to Petrobangla. Within Bangladesh Petrobangla will supply this re-gasified LNG to gas based power producers and other gas consumers.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/24062021/h-energy-signs-lng-mou-with-petrobangla/

You might also like

 
 

Embed article link: (copy the HTML code below):