Skip to main content

USD Partners announces second contract extension at Hardisty terminal

Published by , Editorial Assistant
Hydrocarbon Engineering,


USD Partners LP has announced that it has entered into a four-year extension with Cenovus Energy Inc., increasing its previous position from 7% to 25% of the Hardisty terminal’s capacity.

The renewal contains consistent take-or-pay terms with minimum monthly payments and rates that exceed those of the original terminalling services agreement with the customer.

The Hardisty terminal is located in Alberta, Canada.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/27092018/usd-partners-announces-second-contract-extension-at-hardisty-terminal/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):