Skip to main content

GTT notified by SHI for tank design of two LNG carriers

Published by , Editorial Assistant
Hydrocarbon Engineering,


Gaztransport and Technigaz (GTT) has received a new order from the Korean shipyard Samsung Heavy Industries (SHI), concerning the tank design of two 174 000 m3 LNGCs, on behalf of a European ship owner.

The LNG tanks of both units will be fitted with the Mark III Flex+ membrane containment system developed by GTT, offering a guaranteed boil-off rate of 0.07% of tank volume/day.

The delivery of the vessels is planned during the second semester of 2020.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/25092018/gtt-notified-by-shi-for-tank-design-of-two-lng-carriers/

You might also like

 
 

Embed article link: (copy the HTML code below):