Skip to main content

GTT notified by SHI for tank design of two LNG carriers

Published by , Editorial Assistant
Hydrocarbon Engineering,


Gaztransport and Technigaz (GTT) has received a new order from the Korean shipyard Samsung Heavy Industries (SHI), concerning the tank design of two 174 000 m3 LNGCs, on behalf of a European ship owner.

The LNG tanks of both units will be fitted with the Mark III Flex+ membrane containment system developed by GTT, offering a guaranteed boil-off rate of 0.07% of tank volume/day.

The delivery of the vessels is planned during the second semester of 2020.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/25092018/gtt-notified-by-shi-for-tank-design-of-two-lng-carriers/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):