GTT notified by SHI for tank design of two LNG carriers
Published by Alex Hithersay,
Editorial Assistant
Hydrocarbon Engineering,
Gaztransport and Technigaz (GTT) has received a new order from the Korean shipyard Samsung Heavy Industries (SHI), concerning the tank design of two 174 000 m3 LNGCs, on behalf of a European ship owner.
The LNG tanks of both units will be fitted with the Mark III Flex+ membrane containment system developed by GTT, offering a guaranteed boil-off rate of 0.07% of tank volume/day.
The delivery of the vessels is planned during the second semester of 2020.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/25092018/gtt-notified-by-shi-for-tank-design-of-two-lng-carriers/
You might also like
Hydrocarbon Engineering Podcast
Susan Bell, Senior Vice President within Commodity Markets – Oil, Rystad Energy, discusses the impact of trade wars on global oil demand and oil prices, in light of President Trump’s ‘Liberation Day’ tariffs.
EU shifts on climate targets in the face of industry reality
The EU’s shift on climate targets has come to echo the reality of the industry, according to an Aggreko report.