Matrix awarded ExxonMobil tank construction projects
Published by Tom Mostyn,
Editorial Assistant
Hydrocarbon Engineering,
Matrix Service Co. has announced that its subsidiary, Matrix Service Inc., has been awarded multiple projects by ExxonMobil under a recently signed long-term master service agreement.
The projects, which are already in backlog, include the engineering, fabrication and construction of six 500 000 bbl tanks, four of which will be located at ExxonMobil’s Webster Station in Webster, Texas with the remaining two at its Baytown Complex in Baytown, Texas. Matrix Applied Technologies will supply their FlowDomeTM geodesic domes for the tanks at Webster Station as well as floating roof seals for all six tanks.
“We are very pleased to have been selected by ExxonMobil for these expansion projects which will support the Wink to Webster pipeline system”, said Matrix Service Company President and CEO John R. Hewitt. “As a leader in the design and construction of storage tanks, tank products and terminals, we look forward to working with ExxonMobil on these and future projects, and to delivering this project safely, on time, and with the highest degree of quality.”
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/18022020/matrix-awarded-exxonmobil-tank-construction-projects/
You might also like
Hydrocarbon Engineering Podcast
Rasmus Rubycz, Market Manager for New Energy at Atlas Copco Gas and Process, considers how heat pumps as an industrial technology are gaining greater attention as a result of the increased drive for sustainability and the challenges and opportunities of electrification of process heat.
Woodside signs LNG supply agreements with Uniper
Woodside has signed LNG sale and purchase agreements with Uniper for the supply of 1.0 million tpy from Louisiana LNG LLC and up to 1.0 million tpy from its global portfolio.