Skip to main content

GTT receives order for the tank design of four LNG carriers

Published by , Editorial Assistant
Hydrocarbon Engineering,


Gaztransport & Technigaz (GTT) has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) concerning the tank design of four new LNG carriers.

The carriers will be built on behalf of the Greek ship-owner Capital Gas Carriers.

GTT's Mark III Flex technology has been selected to equip the LNG tanks of the four 174 000 m3 ships. The delivery of these vessels is scheduled between the end of 2020 and mid-2021.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/10092018/gtt-receives-order-for-the-tank-design-of-four-lng-carriers/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):