Skip to main content

GTT receives order for the tank design of four LNG carriers

Published by , Editorial Assistant
Hydrocarbon Engineering,


Gaztransport & Technigaz (GTT) has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) concerning the tank design of four new LNG carriers.

The carriers will be built on behalf of the Greek ship-owner Capital Gas Carriers.

GTT's Mark III Flex technology has been selected to equip the LNG tanks of the four 174 000 m3 ships. The delivery of these vessels is scheduled between the end of 2020 and mid-2021.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/10092018/gtt-receives-order-for-the-tank-design-of-four-lng-carriers/

You might also like

Hydrocarbon Engineering podcast

Hydrocarbon Engineering Podcast

Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.

Listen for free today »

 
 
 

Embed article link: (copy the HTML code below):