GTT receives order for the tank design of four LNG carriers
Published by Alex Hithersay,
Editorial Assistant
Hydrocarbon Engineering,
Gaztransport & Technigaz (GTT) has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) concerning the tank design of four new LNG carriers.
The carriers will be built on behalf of the Greek ship-owner Capital Gas Carriers.
GTT's Mark III Flex technology has been selected to equip the LNG tanks of the four 174 000 m3 ships. The delivery of these vessels is scheduled between the end of 2020 and mid-2021.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/10092018/gtt-receives-order-for-the-tank-design-of-four-lng-carriers/
You might also like
Hydrocarbon Engineering Podcast
Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.
LBC Rotterdam completes construction of 36 storage tanks
LBC Rotterdam have announced the completion and the arrival of all 36 new storage tanks.