GTT receives order notification for a new LNG carrier
Published by Alex Hithersay,
Editorial Assistant
Hydrocarbon Engineering,
Gaztransport & Technigas (GTT) has received a new order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier (LNGC), to be built on behalf of a European ship-owner.
The LNG tanks of the vessel will be equipped with the Mark III Flex containment system developed by GTT. The vessel's delivery is expected during the second half of 2020.
For confidentiality purposes, the names of the contracting parties of the project cannot be disclosed.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/05092018/gtt-receives-order-notification-for-a-new-lng-carrier/
You might also like
Hydrocarbon Engineering Podcast
Peter Davidson, CEO of the Tank Storage Association (TSA), joins us to discuss the essential role that the tank storage sector has to play in ensuring supply security and resilience, as well as in facilitating the energy transition.
Golar LNG signs finance lease agreements for FLNG Gimi
Golar LNG has signed finance lease agreements for FLNG Gimi with a consortium of Chinese companies.