GTT receives order notification for a new LNG carrier
Published by Alex Hithersay,
Editorial Assistant
Hydrocarbon Engineering,
Gaztransport & Technigas (GTT) has received a new order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier (LNGC), to be built on behalf of a European ship-owner.
The LNG tanks of the vessel will be equipped with the Mark III Flex containment system developed by GTT. The vessel's delivery is expected during the second half of 2020.
For confidentiality purposes, the names of the contracting parties of the project cannot be disclosed.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/05092018/gtt-receives-order-notification-for-a-new-lng-carrier/
You might also like
The Hydrocarbon Engineering Podcast
A podcast series for professionals in the downstream industry featuring short, insightful interviews. Subscribe on your favourite podcast app to start listening today.
