GTT receives new orders
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
Gaztransport & Technigaz (GTT) has received an order from a South Korean shipyard for the design of LNG tanks of a new LNG carrier and a new floating storage and regasification unit (FSRU).
These vessels will be built on behalf of a European shipowner. Their delivery is expected for 1H20.
GTT will design the LNG tanks of both units, each having a capacity of 173 400 m3. The insulation solutions retained are NO96 GW for the LNG carrier and NO96 for the FSRU.
The shipowner and shipyard's names remain confidential.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/05032018/gtt-receives-new-orders/
You might also like
The Hydrocarbon Engineering Podcast - Overcoming downstream challenges with new technology
In this episode of the Hydrocarbon Engineering Podcast, Omar Sayeed, Centre of Excellence Leader for Reliability, and Rahul Negi, Director of AI and Industrial Autonomous, Honeywell Process Solutions, consider how new, innovative technology can help to overcome some of the challenges facing the downstream oil and gas sector.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.