GTT receives new orders
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
Gaztransport & Technigaz (GTT) has received an order from a South Korean shipyard for the design of LNG tanks of a new LNG carrier and a new floating storage and regasification unit (FSRU).
These vessels will be built on behalf of a European shipowner. Their delivery is expected for 1H20.
GTT will design the LNG tanks of both units, each having a capacity of 173 400 m3. The insulation solutions retained are NO96 GW for the LNG carrier and NO96 for the FSRU.
The shipowner and shipyard's names remain confidential.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/05032018/gtt-receives-new-orders/
You might also like
Hydrocarbon Engineering Podcast
Susan Bell, Senior Vice President within Commodity Markets – Oil, Rystad Energy, discusses the impact of trade wars on global oil demand and oil prices, in light of President Trump’s ‘Liberation Day’ tariffs.
VERSO ENERGY and GROUPE ADP partner to develop SAF
VERSO ENERGY and GROUPE ADP have signed a strategic partnership to develop the SAF sector on French, European, and international airport platforms.