Skip to main content

GTT receives FSRU order

Published by , Senior Editor
Hydrocarbon Engineering,


GTT has received an order notification from Hyundai Heavy Industries (HHI) to equip a new floating storage and regasification unit (FSRU) with its Mark III cryogenic membrane containment system.

The FSRU of 170 000 m3 will be built on behalf of a European ship-owner. Its delivery is scheduled in 2020.

"We are very pleased to pursue our long term partnership with HHI through this project." commented Philippe Berterottière, Chairman and CEO of GTT. He added: "FSRU are the prime solution chosen by operators as they constitute an economical alternative to onshore storage terminals and offer a higher flexibility, with reduced construction delays. The Mark III technology is perfectly competitive and adapted to this vessel type."

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/04062018/gtt-receives-fsru-order/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news