Skip to main content

LNG milestone for Gate terminal

Published by
Hydrocarbon Engineering,


In a first for the terminal, Gate recently loaded two small LNG carriers at the same time.

The Cardissa LNG bunkering vessel was at the dedicated small scale jetty, while the ice-class Coral Energice was loaded at Jetty 1, one of the two jetties that can handle both small and large scale LNG carriers.

Simultaneously a record daily number of 12 LNG trailers/containers were loaded.

Gate has seen a steady increase in its small scale LNG activities since the dedicated third small scale LNG jetty became operational in 2016, along with the additional two automated LNG truckloading bays in 2017. Gate notes that it continues to see a growing interest in its small scale services.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/03052018/lng-milestone-for-gate-terminal/

You might also like

Catalysts 2019

Catalysts 2019

Catalysts 2019 is an online conference for professionals in the downstream sector. Since this is a completely virtual conference, you can join us from anywhere in the world, absolutely free. Register for free today »

 
 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news