Skip to main content

LNG milestone for Gate terminal

Published by , Senior Editor
Hydrocarbon Engineering,


In a first for the terminal, Gate recently loaded two small LNG carriers at the same time.

The Cardissa LNG bunkering vessel was at the dedicated small scale jetty, while the ice-class Coral Energice was loaded at Jetty 1, one of the two jetties that can handle both small and large scale LNG carriers.

Simultaneously a record daily number of 12 LNG trailers/containers were loaded.

Gate has seen a steady increase in its small scale LNG activities since the dedicated third small scale LNG jetty became operational in 2016, along with the additional two automated LNG truckloading bays in 2017. Gate notes that it continues to see a growing interest in its small scale services.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/03052018/lng-milestone-for-gate-terminal/

You might also like

The Hydrocarbon Engineering Podcast - Overcoming downstream challenges with new technology

In this episode of the Hydrocarbon Engineering Podcast, Omar Sayeed, Centre of Excellence Leader for Reliability, and Rahul Negi, Director of AI and Industrial Autonomous, Honeywell Process Solutions, consider how new, innovative technology can help to overcome some of the challenges facing the downstream oil and gas sector.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news