Skip to main content

Tango FLNG en route to Argentina

Published by
Hydrocarbon Engineering,


On 27 December 2018, Exmar announced that its floating LNG (FLNG) liquefaction unit, to be renamed Tango FLNG, had left China, just one month after contract signing.

The voyage to Bahia Blanca, Argentina, was expected to take approximately 45 days.

Upon its arrival, Tango FLNG will be put in operation for Exmar’s customer YPF S.A. and is expected to start up LNG production in the 2Q19. Tango FLNG is designed for a liquefaction capacity of approximately 0.5 million tpy of LNG and is expected to play a central role in YPF’s efforts to export the Vaca Muerta gas reserves to international markets.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/02012019/tango-flng-en-route-to-argentina/

You might also like

Catalysts 2019

Catalysts 2019

Catalysts 2019 is an online conference for professionals in the downstream sector. Since this is a completely virtual conference, you can join us from anywhere in the world, absolutely free. Register for free today »

 
 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news