Graham Corp. launches steam ejector nozzle with successful Gulf Coast refinery installation
Published by Poppy Clements,
Assistant Editor
Hydrocarbon Engineering,
The NextGen steam ejector nozzles are engineered to reduce steam consumption, lower operating costs, and increase system capacity, allowing refineries and process plants to enhance throughput while minimising their carbon footprint. Ultimately these benefits drive profitability, positioning the NextGen technology as a critical tool for refineries to optimise both performance and financial returns. With this launch, Graham demonstrates its commitment to helping customers meet stringent sustainability goals and emissions regulations through innovation.
In this installation, the customer achieved a 5.6% reduction in overall steam consumption, which is expected to result in the customer saving an estimated US$270 000 annually in utility costs. The refinery also increased capacity by 3.1% and improved vacuum levels by 10.4%. Additionally, the reduction in steam usage is expected to cut 1970 tpy of CO2 emissions , supporting the customer's environmental and financial objectives.
Dan Thoren, Graham Corp. President and CEO, commented: “We are very proud to see our NextGen nozzle technology deliver such tangible results. The successful demonstration of our R&D investments through this installation proves the value of innovation in improving efficiency and sustainability. A key benefit of reducing steam consumption is the corresponding reduction in CO2 emissions, which can have a meaningful impact on a plant’s emissions profile and carbon credit position. By optimising vacuum systems with this new technology, we help our customers improve both their operational efficiency and profitability, while also enhancing their environmental impact.”
Read the article online at: https://www.hydrocarbonengineering.com/product-news/16102024/graham-corp-launches-steam-ejector-nozzle-with-successful-gulf-coast-refinery-installation/
You might also like
Wood wins significant decarbonisation project in the Middle East
Wood has secured a contract worth around US$17 million from a leading petrochemical company in the Middle East to improve efficiency and reduce emissions on a process manufacturing plant.