Sinopec to shut down production at ethylene plant for maintenance
Published by Nicholas Woodroof,
Editor
Hydrocarbon Engineering,
The plant, which has a capacity of 180 000 tpy, has also began maintenance on its 600 000 tpy methanol to olefins unit that will last unitl 22 October.
The overhaul aims to remove safety risks at the production units and ensure smooth operation in the next five years.
Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/28072020/sinopec-to-shut-down-production-at-ethylene-plant-for-maintenance/
You might also like
The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process
In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.