Sinopec to shut down production at ethylene plant for maintenance
Published by Nicholas Woodroof,
Editor
Hydrocarbon Engineering,
The plant, which has a capacity of 180 000 tpy, has also began maintenance on its 600 000 tpy methanol to olefins unit that will last unitl 22 October.
The overhaul aims to remove safety risks at the production units and ensure smooth operation in the next five years.
Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/28072020/sinopec-to-shut-down-production-at-ethylene-plant-for-maintenance/
You might also like
The Hydrocarbon Engineering Podcast - Midstream matters
In this episode of the Hydrocarbon Engineering Podcast, Sarah Miller, President and CEO of the GPA Midstream Association, joins us to consider the vital importance of midstream operations, and some of the key challenges and opportunities facing the sector.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.