Skip to main content

Framo wins FSRU order

Published by
Hydrocarbon Engineering,


Framo has announced that it has received a contract to deliver sea water lift pumps for GasLog’s potential floating storage regasification unit (FSRU) at the Samsung Heavy Industries shipyard in South Korea.

The order was placed shortly after Framo signed a supply agreement for similar pump systems for an FSRU under construction at the same Korean yard for shipowner Høegh LNG.

Thorbjørn Vågenes, Director Oil and Gas pumping systems at Framo, said: “This represents acknowledgement of our ultra-compact pump concept that is now gaining a solid position on the FSRU market.”

Delivery of the pump systems is scheduled for August 2018.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/30082017/framo-wins-fsru-order/

You might also like

Reaching new heights

Joost Meeuwissen, Calderys, the Netherlands, describes how pre-cast, pre-fired catalyst support domes are setting new standards when it comes to long-lasting durability.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news