Skip to main content

Framo wins FSRU order

Published by , Senior Editor
Hydrocarbon Engineering,


Framo has announced that it has received a contract to deliver sea water lift pumps for GasLog’s potential floating storage regasification unit (FSRU) at the Samsung Heavy Industries shipyard in South Korea.

The order was placed shortly after Framo signed a supply agreement for similar pump systems for an FSRU under construction at the same Korean yard for shipowner Høegh LNG.

Thorbjørn Vågenes, Director Oil and Gas pumping systems at Framo, said: “This represents acknowledgement of our ultra-compact pump concept that is now gaining a solid position on the FSRU market.”

Delivery of the pump systems is scheduled for August 2018.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/30082017/framo-wins-fsru-order/

You might also like

The Hydrocarbon Engineering Podcast - Overcoming downstream challenges with new technology

In this episode of the Hydrocarbon Engineering Podcast, Omar Sayeed, Centre of Excellence Leader for Reliability, and Rahul Negi, Director of AI and Industrial Autonomous, Honeywell Process Solutions, consider how new, innovative technology can help to overcome some of the challenges facing the downstream oil and gas sector.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news