BP and KOGAS sign long-term LNG SPA
Published by Poppy Clements,
Assistant Editor
Hydrocarbon Engineering,
BP has entered into a long-term LNG sale and purchase agreement (SPA) with Korea Gas Corp. (KOGAS).
Under the agreement, BP will provide KOGAS with up to 9.8 million t of LNG over 11 years on a delivered ex-ship (DES) basis from BP’s diverse portfolio of LNG sources. This deal is in addition to the existing long-term SPA between BP and KOGAS for DES supply of LNG that was signed in 2022.
Deliveries will commence in mid-2026. The deal was signed between KOGAS and BP’s Singapore-based entity, BP Singapore Pte. Ltd.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/30042024/bp-and-kogas-sign-long-term-lng-spa/
You might also like
Hydrocarbon Engineering Podcast
Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.
Duqm refinery enhances sulfur processing with IPCO technology
Duqm Refinery has installed three IPCO SG20 drum granulators to process sulfur efficiently and meet SUDIC standards. The advanced system offers high capacity, reduced emissions, and consistent product quality, addressing common challenges in traditional drum granulation with innovative features and simplified, continuous operation.