Skip to main content

Chart Industries receives order from Venture Global

Published by , Senior Editor
Hydrocarbon Engineering,


Chart Industries Inc. has received an order for the production of six brazed aluminium heat exchanger (BAHX) assemblies and cold boxes for Venture Global’s 10 million tpy Plaquemines Phase 2 LNG export terminal project.

Chart booked the equipment order of US$45 million from Baker Hughes.

This order is for the first six BAHX assemblies and cold boxes of the anticipated 18 BAHX assemblies and cold boxes for the full Plaquemines Phase 2 facility.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/30032022/chart-industries-receives-order-from-venture-global/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news