Chart Industries receives order from Venture Global
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
Chart Industries Inc. has received an order for the production of six brazed aluminium heat exchanger (BAHX) assemblies and cold boxes for Venture Global’s 10 million tpy Plaquemines Phase 2 LNG export terminal project.
Chart booked the equipment order of US$45 million from Baker Hughes.
This order is for the first six BAHX assemblies and cold boxes of the anticipated 18 BAHX assemblies and cold boxes for the full Plaquemines Phase 2 facility.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/30032022/chart-industries-receives-order-from-venture-global/
You might also like
The Hydrocarbon Engineering Podcast - Insights into the UN Global Plastics Treaty negotiations
In this episode of the Hydrocarbon Engineering Podcast, Rob Benedict, Vice President, Petrochemicals and Midstream, American Fuel & Petrochemical Manufacturers (AFPM), discusses the outcomes of the final round of UN negotiations for a Global Plastics Treaty.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.