Chart Industries receives order from Venture Global
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
Chart Industries Inc. has received an order for the production of six brazed aluminium heat exchanger (BAHX) assemblies and cold boxes for Venture Global’s 10 million tpy Plaquemines Phase 2 LNG export terminal project.
Chart booked the equipment order of US$45 million from Baker Hughes.
This order is for the first six BAHX assemblies and cold boxes of the anticipated 18 BAHX assemblies and cold boxes for the full Plaquemines Phase 2 facility.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/30032022/chart-industries-receives-order-from-venture-global/
You might also like
Hydrocarbon Engineering Podcast
Susan Bell, Senior Vice President within Commodity Markets – Oil, Rystad Energy, discusses the impact of trade wars on global oil demand and oil prices, in light of President Trump’s ‘Liberation Day’ tariffs.
Baker Hughes acquires Continental Disc Corp. for pressure management solutions
Baker Hughes has acquired Continental Disc Corp., a differentiated leader in pressure management solutions.