Chart Industries receives order from Venture Global
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
Chart Industries Inc. has received an order for the production of six brazed aluminium heat exchanger (BAHX) assemblies and cold boxes for Venture Global’s 10 million tpy Plaquemines Phase 2 LNG export terminal project.
Chart booked the equipment order of US$45 million from Baker Hughes.
This order is for the first six BAHX assemblies and cold boxes of the anticipated 18 BAHX assemblies and cold boxes for the full Plaquemines Phase 2 facility.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/30032022/chart-industries-receives-order-from-venture-global/
You might also like
The Hydrocarbon Engineering Podcast - Overcoming downstream challenges with new technology
In this episode of the Hydrocarbon Engineering Podcast, Omar Sayeed, Centre of Excellence Leader for Reliability, and Rahul Negi, Director of AI and Industrial Autonomous, Honeywell Process Solutions, consider how new, innovative technology can help to overcome some of the challenges facing the downstream oil and gas sector.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.