Chart Industries receives order from Venture Global
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
Chart Industries Inc. has received an order for the production of six brazed aluminium heat exchanger (BAHX) assemblies and cold boxes for Venture Global’s 10 million tpy Plaquemines Phase 2 LNG export terminal project.
Chart booked the equipment order of US$45 million from Baker Hughes.
This order is for the first six BAHX assemblies and cold boxes of the anticipated 18 BAHX assemblies and cold boxes for the full Plaquemines Phase 2 facility.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/30032022/chart-industries-receives-order-from-venture-global/
You might also like
The Hydrocarbon Engineering Podcast - Oil, gas, and the data centre boom
In this episode of the Hydrocarbon Engineering Podcast, David Wilson, CEO, Energy Exemplar, joins us to consider the role that oil and gas is currently playing in the booming data centre industry, and what the future holds.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.
