Snam: 90% filling target achieved through latest auctions
Published by Ellie Brosnan,
Editorial Assistant
Hydrocarbon Engineering,
Together with the auctions already completed, the latest auctions have allowed to reach a total allocated volume of 17.5 billion m3 out of a total domestic storage capacity of just over 19 billion m3, as the combined result of the physical availability of gas already in storage at the start of the injection season and the volumes contractually allocated.
As of today, with the filling campaign under way, the volume of gas physically present in Italian storage sites amounts to more than 46.5% of available capacity, compared with a European average of 30.6% (including Italy).
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/24042026/snam-90-filling-target-achieved-through-latest-auctions/
You might also like
The Hydrocarbon Engineering Podcast
A podcast series for professionals in the downstream industry featuring short, insightful interviews. Subscribe on your favourite podcast app to start listening today.
