Skip to main content

Linde and NLMK sign industrial gases supply agreement in Russia

Published by
Hydrocarbon Engineering,


The technology company The Linde Group and the NLMK Group, an international manufacturer of steel products, have signed an agreement for the long-term supply of oxygen, nitrogen, and argon to the Novolipetsk Steel site in Russia.

Linde is to invest around €100 million into a new air separation unit (ASU), and build, own and operate it at the customer’s site, the steel works located in Lipetsk, Russia. NLMK operates a blast furnace as well as steelmaking and metal rolling facilities at the location.

The new air separation unit will have a production capacity of around 72 000 m3/hr of gaseous oxygen and is expected to come onstream in 4Q21.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/23112018/linde-and-nlmk-sign-industrial-gases-supply-agreement-in-russia/

You might also like

Catalysts 2019

Catalysts 2019

Catalysts 2019 is an online conference for professionals in the downstream sector. Since this is a completely virtual conference, you can join us from anywhere in the world, absolutely free. Register for free today »

 

Patching up problems

3X ENGINEERING takes a look at composite solutions for storage tank repair and reinforcement.

 
 

Embed article link: (copy the HTML code below):