Skip to main content

GTT to equip LNG carrier

Published by , Editorial Assistant
Hydrocarbon Engineering,


GTT has received an order from Hyundai Heavy Industries to equip a new LNG carrier with its Mark III Flex containment system. Hyundai's shipyard based in Ulsan – South Korea – will build the vessel of 180 000 m3 on behalf of the Norwegian shipping company NORSPAN LNG XI AS (Knutsen). Delivery is scheduled in 2019.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/22032017/gtt-to-equip-lng-carrier/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):