GTT to equip LNG carrier
Published by Francesca Brindle,
Editorial Assistant
Hydrocarbon Engineering,
GTT has received an order from Hyundai Heavy Industries to equip a new LNG carrier with its Mark III Flex containment system. Hyundai's shipyard based in Ulsan – South Korea – will build the vessel of 180 000 m3 on behalf of the Norwegian shipping company NORSPAN LNG XI AS (Knutsen). Delivery is scheduled in 2019.
To read the full article
"GTT to equip LNG carrier"
Please sign in or register for FREE
Sign in »
Register for free »
Get started absolutely FREE in 2 minutes, plus receive a free printed magazine.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/22032017/gtt-to-equip-lng-carrier/
You might also like
The Hydrocarbon Engineering Podcast
A podcast series for professionals in the downstream industry featuring short, insightful interviews. Subscribe on your favourite podcast app to start listening today.
