Skip to main content

KANATA Energy announces Taqa North partnership, Valhalla expansion

Published by
Hydrocarbon Engineering,


KANATA Energy Group Ltd, together with its joint venture partner TAQA North Ltd, has announced the completion and start-up of an expansion to the 13-21-076-09 W6M Valhalla Sour Gas Processing Facility.

The facility processing capacity has been expanded from 12 million ft3/d to 45 million ft3/d, with additional liquids handling and underground acid gas disposal, in an effort to improve the environmental footprint of the area’s oil and gas operations.

Customers will have egress optionality as the facility is connected to both the TransCanada and Alliance pipeline systems.

KANATA will be assuming operation of the facility and is marketing available processing capacity.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/18122018/kanata-energy-announces-taqa-north-partnership-valhalla-expansion/

You might also like

Catalysts 2019

Catalysts 2019

Catalysts 2019 is an online conference for professionals in the downstream sector. Since this is a completely virtual conference, you can join us from anywhere in the world, absolutely free. Register for free today »

 

Patching up problems

3X ENGINEERING takes a look at composite solutions for storage tank repair and reinforcement.

 
 

Embed article link: (copy the HTML code below):