Skip to main content

KANATA Energy announces Taqa North partnership, Valhalla expansion

Published by , Editorial Assistant
Hydrocarbon Engineering,


KANATA Energy Group Ltd, together with its joint venture partner TAQA North Ltd, has announced the completion and start-up of an expansion to the 13-21-076-09 W6M Valhalla Sour Gas Processing Facility.

The facility processing capacity has been expanded from 12 million ft3/d to 45 million ft3/d, with additional liquids handling and underground acid gas disposal, in an effort to improve the environmental footprint of the area’s oil and gas operations.

Customers will have egress optionality as the facility is connected to both the TransCanada and Alliance pipeline systems.

KANATA will be assuming operation of the facility and is marketing available processing capacity.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/18122018/kanata-energy-announces-taqa-north-partnership-valhalla-expansion/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):