Skip to main content

EnerMech awarded Prelude contract

Published by , Senior Editor
Hydrocarbon Engineering,


EnerMech has announced that it has been awarded a five year contract for hose and hose fittings supply and services for Shell’s Prelude FLNG facility in Western Australia.

The contract will be administered from EnerMech’s Henderson base in Perth while engineering and service support will be provided from regional facilities across Australia, including Darwin.

EnerMech’s Regional Director, Allan Hart, said: “This latest award strengthens EnerMech’s reputation as a leading maintenance service provider with a willingness to adapt to the changing oil and gas environment.”

The Prelude FLNG facility recently arrived at its location 475 km north east of Broome where the hook-up and commissioning phase of the project is underway.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/17102017/enermech-awarded-prelude-contract/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news