Tidewater awards WorleyParsons contract for sour gas plant
Published by Alex Hithersay,
Editorial Assistant
Hydrocarbon Engineering,
WorleyParsons has been awarded a fabrication and construction contract for the Pipestone Sour Gas Plant in Canada by Tidewater Midstream and Infrastructure Ltd (Tidewater).
Under the contract, WorleyParsonsCord will provide fabrication and construction services for the Pipestone Sour Gas Plant.
The plant is a 100 000 ft3/d sour, deep-cut gas plant with acid gas injection with processing capability of 20 000 bpd of NGLs.
“We are pleased to be awarded this contract by Tidewater and look forward to supporting their growth in the Canadian natural gas and liquids market,” said Andrew Wood, CEO, WorleyParsons.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/12112018/tidewater-awards-worleyparsons-contract-for-sour-gas-plant/
You might also like
Low US distillate consumption reflects slow economic activity and biofuel substitution
The EIA reports that US distillate consumption so far this year is lower than usual because of warm winter weather, reduced manufacturing activity, and continued substitution of biofuels in place of petroleum distillate on the US West Coast (PADD 5).