N2 Solutions opens West-Gulf Coast facility
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
N2 Solutions (N2S) has opened a fully integrated West-Gulf Coast facility in Highlands, Texas, US.
Strategically located to provide complete nitrogen service and support on an immediate basis, the 24/7 facility is capable of independent operation, maintaining and dispatching equipment and personnel to service projects from the East Texas state line on westward.
The facility hosts onsite liquid N2 storage, some 6000 ft2 of building space, an attached wash bay, three tall vehicle bay doors that access the shop, and a mezzanine storage loft accessed by an industrial elevator in-house.
Jake Garber, COO, stated: “This new location allows us to service clients across a wider area and with a decreased mobilisation cost. Offering more cost competitive rates and a faster turnaround time puts us in a ready position to better penetrate the West-Gulf market. Additionally, the expansion into the West-Gulf Coast area gives N2 Solutions a platform for substantial growth in the petrochemical market.”
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/11022022/n2-solutions-opens-west-gulf-coast-facility/
You might also like
Sulzer opens new Service Center in Kuwait
The Service Center will provide around-the-clock engineering services for all brands of pumps and rotating equipment.