Skip to main content

GTT receives new order from HHI

Published by , Senior Editor
Hydrocarbon Engineering,


GTT has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) for the tank design of two LNG carriers on behalf of a European ship-owner.

Each vessel will offer a capacity of 174 000 m3. GTT will design the tanks of the vessels, which will be fitted with the Mark III Flex membrane containment system. Deliveries of the vessels are scheduled for 4Q22 and 3Q23, respectively.

Philippe Berterottière, Chairman and CEO of GTT, declared: "We are pleased with the confidence placed in us by HHI, a partner with whom GTT has developed a long-term collaboration.”

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/08122020/gtt-receives-new-order-from-hhi/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news