GTT receives new order from HHI
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
GTT has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) for the tank design of two LNG carriers on behalf of a European ship-owner.
Each vessel will offer a capacity of 174 000 m3. GTT will design the tanks of the vessels, which will be fitted with the Mark III Flex membrane containment system. Deliveries of the vessels are scheduled for 4Q22 and 3Q23, respectively.
Philippe Berterottière, Chairman and CEO of GTT, declared: "We are pleased with the confidence placed in us by HHI, a partner with whom GTT has developed a long-term collaboration.”
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/08122020/gtt-receives-new-order-from-hhi/
You might also like
Hydrocarbon Engineering Podcast
Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.
LBC Rotterdam completes construction of 36 storage tanks
LBC Rotterdam have announced the completion and the arrival of all 36 new storage tanks.