New Fortress Energy signs FSRU charter
Published by Poppy Clements,
Assistant Editor
Hydrocarbon Engineering,
“We are extremely pleased to reach this agreement with Petrobras and begin operations at the TGS terminal in Santa Catarina, Brazil, ahead of schedule in January 2024. The TGS terminal is a unique, high-growth opportunity for NFE, as connection to the pipeline system in south Brazil offers a diverse and near-term set of opportunities across power and gas supply," said Andrew Dete, Managing Director of New Fortress Energy.
The Energos Winter will be sub-chartered by NFE through the remaining term of the Petrobras charter with Energos infrastructure and then direct-chartered by NFE on a long-term basis with Energos. This will enable NFE to commence commercial operations at TGS in January 2024 and continue uninterrupted service on a long-term basis. Energos Infrastructure, the owner of the Energos Winter, is owned 80% by funds managed by Apollo and 20% by NFE.
The transactions are subject to customary terms and conditions.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/06112023/new-fortress-energy-signs-fsru-charter/
You might also like
The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process
In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.