Novatek delivering long-term strategy
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
Speaking after Russian gas producer Novatek announced that it had given the US$21 billion Arctic LNG 2 project the go-ahead, Wood Mackenzie Senior Analyst Nikolai Novikov commented: “Novatek keeps delivering on its promises and is on schedule with commissioning in 2023.
“This FID brings Novatek closer to its long-term strategy of maximising cost competitiveness across LNG markets and becoming a global LNG player.”
He added: “Novatek played the safety card by ordering the topside modules for Train 1 at Chinese yards. The next steps for Novatek will be contracting the remaining equipment, finalising the financing structure and deciding if it wants to attract a last partner in the project.”
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/05092019/novatek-delivering-long-term-strategy/
You might also like
The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process
In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.