Skip to main content

Sabine Pass LNG train 3 project progresses

Published by , Editorial Assistant
Hydrocarbon Engineering,


Cheniere Energy is commissioning its 4.5 million tpy Sabine Pass Train 3 liquefied natural gas (LNG) liquefaction facility in Louisiana.

Company executives announced the update on 28th Feb 2017 (Tuesday), with expectations to have it fully online by March 2017. The US$2.5 billion project will increase the total LNG capacity at the facility to 13.5 million tpy.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/02032017/sabine-pass-lng-train-3-project-progresses/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news North America downstream news