Air Liquide completes world's largest low-carbon hydrogen membrane-based production unit
Supplied with renewable energy, this unit is now producing up to 8.2 tpd of low-carbon hydrogen in Bécancour, Québec.
Supplied with renewable energy, this unit is now producing up to 8.2 tpd of low-carbon hydrogen in Bécancour, Québec.
In order to meet aviation's commitment for reducing carbon emissions by 50% from 2005 levels by 2050, airplanes need the capability to fly on 100% sustainable aviation fuels well before 2050.
API has issued a statement on the Biden administration’s energy and climate executive orders.
The two companies are investigating the large-scale production of fossil-free hydrogen for the biofuel sector.
Johnson Matthey has announced new manufacturing capacity for the production of catalyst coated membranes, which sit at the heart of electrolyser units.
The company has acquired a 40% stake in H2V Normandy, which is aiming to build a electrolyser complex for the production of renewable and low-carbon hydrogen.
KBR will provide technical solutions to support SK E&S's plan to build a 30 000 tpy liquefied hydrogen facility and supply liquefied hydrogen to various metropolitan areas in South Korea.
Once operational, the plant will process around 250 000 t of locally sourced wheat straw per year into 50 000 t of cellulosic ethanol.
McDermott’s CB&I Storage Solutions business has been awarded a study to research opportunities to expand current liquid hydrogen storage capacity limits.
Alfa Laval will head a development initiative that will aim to find scalable solutions for non-carbon fuels for the shipping industry.
The project will be the first of its kind to use waste tyres as feedstock for low carbon, low sulfur fuel production.
thyssenkrupp has been awarded an engineering contract to install a water electrolysis plant, which will advance both green hydrogen and biofuel production in the country.
The joint venture will manufacture hydrogen at Essar’s Stanlow Refinery in Ellesmere Port, Cheshire, UK.
The agency said it is proposing to extend the compliance deadline for 2019 to 30 November 2021, and the 2020 deadline to 31 January 2022.
The new 24-megawatt electrolyser at the Leuna Chemical Complex in Germany will produce green hydrogen to supply Linde's industrial customers.