Skip to main content

Cameron LNG authorised to begin service

Published by , Senior Editor
Hydrocarbon Engineering,


The US Federal Energy Regulatory Commission (FERC) has granted Cameron LNG LLC authorisation to commence service for liquefaction and export activities from Train 1 at its LNG facility.

Based on Commission staff inspections and review of the commissioning activities for the Cameron Liquefaction Project, FERC stated that Cameron LNG has demonstrated that its facilities have been constructed in accordance with Commission approval and applicable standards, and can be expected to operate safely as designed.

FERC also noted that that the rehabilitation and restoration of the areas affected by the Cameron Liquefaction Project are proceeding satisfactorily.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/29072019/cameron-lng-authorised-to-begin-service/

You might also like

Hydrocarbon Engineering podcast

Hydrocarbon Engineering Podcast

Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.

Listen for free today »

 

Duqm refinery enhances sulfur processing with IPCO technology

Duqm Refinery has installed three IPCO SG20 drum granulators to process sulfur efficiently and meet SUDIC standards. The advanced system offers high capacity, reduced emissions, and consistent product quality, addressing common challenges in traditional drum granulation with innovative features and simplified, continuous operation.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news