New Fortress Energy executes charter for Energos Winter
Published by Ellie Brosnan,
Editorial Assistant
Hydrocarbon Engineering,
The Energos Winter will operate at EGAS’ LNG import terminal located at Damietta, Egypt. This is NFE’s second FSRU stationed in Egypt, and will join the Energos Eskimo in Egypt as early as August 2025.
“We are pleased to reinforce our relationship with EGAS by way of our deployment of a second FSRU to Egypt. This deal enhances NFE’s goals of providing reliable and cost-effective energy across the globe,” said Chris Guinta, CFO of NFE.
“EGAS is pleased to strengthen its long-standing partnership with NFE through the execution of a second regasification service agreement. Under this agreement, NFE’s second FSRU, Energos Winter, will provide regasification services at the Damietta terminal, contributing to the security of natural gas supply for the Arab Republic of Egypt over the next 5 years,” said Yasseen Mohamed, Executive Managing Director of EGAS.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/28072025/new-fortress-energy-executes-charter-for-energos-winter/
You might also like
The Hydrocarbon Engineering Podcast - Process safety improvements in the downstream sector
In this episode of the Hydrocarbon Engineering Podcast, Lara Swett, Vice President of Technical & Safety Programs, American Fuel & Petrochemical Manufacturers (AFPM), joins us to explain how the downstream sector has continued to improve its process safety record.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.