Skip to main content

Phase 2 concludes on HES International’s Botlek terminal

Published by , Editorial Assistant
Hydrocarbon Engineering,


HES International has announced the completion of Phase 2 on its Botlek tank terminal.

Although the tanks were already operational, they still needed to be painted. With the completion of this paintwork, Phase 2 is officially concluded.

The current capacity of 490 000 m3 will however soon be expanded as the next project begins.

This expansion consists of six tanks for biofuels with a total capacity of 20 000 m3.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/26112018/phase-2-concludes-on-hes-internationals-botlek-terminal/

You might also like

The Hydrocarbon Engineering Podcast - Insights into the UN Global Plastics Treaty negotiations

In this episode of the Hydrocarbon Engineering Podcast, Rob Benedict, Vice President, Petrochemicals and Midstream, American Fuel & Petrochemical Manufacturers (AFPM), discusses the outcomes of the final round of UN negotiations for a Global Plastics Treaty.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news Europe downstream news